EXHIBIT 2
Holt
FILED: NEW YORK COUNTY CLERK 05/07/2024 02:18 PM INDEX NO. 652351/2024
NYSCEF DOC. NO. 3 RECEIVED NYSCEF: 05/07/2024
50 East Washington Avenue April 29, 2019
Pearl River, NY 10965
(845) 735-4054
Fax No. (845) 735-4570
CONSTRUCTION
Dear N.C. & Sons, Inc, The Nicholson Corporation,
Re: American Express - Centurion Lounge
We would like to congratulate N.C. & Sons, Inc, The Nicholson Corporation on the award of the attached contract for work at the American
Express - Centurion Lounge project located in Jamaica, NY. in an attempt to keep the flow of information moving and ultimately provide timely
payments to you, please note the requisite items listed below are extremely important in achieving ihose goals.
Enclosed you will find our subcontract agreement. This agreement contains project specific terms and conditions. Master Subcontract
Ternis, which terms and conditions therein are referenced to the subcontract agreement. It is our intent that you have previously executed the
Master Subcontract Terms as presented with no changes or exceptions. We understand you will complete your work in timely manner in
harmony with all trades. Kindly return a signed copy with your Certificate of Insurance listing Holt Construction Corp. and
additional insured's (sample Exhibit E). We prefer to receive electronic copies at Contractseholtcc.com. We will countersign
and return one (1) copy for your files. Your initiation of work shall be deemed to constitute acceptance by you of the terms and conditions
of this contract and of our Master Subcontract Terms with no exceptions. However, if you were sent a letter of intent, then you have already
agreed to our Subcontract Agreement and our Master Subcontract Terms.
If you are not in total agreement with our Master Subcontract Terms, Subcontract Agreement, contract amount,
completion date or any other item herein, you will not perform any work for the above-mentioned project without first
notifying our office in writing. If we do not receive anything in writing within 2 dayz, lt will be that all parties are of the
understanding that we have an agreement as per the subcontract agreement enclosed with no exceptions.
The signature page of the Subcontract Agreement must include the typed name and title of the representative signing the document; the
signature must then be witnessed and your corporate seal affixed in the spaces indicated. Execution of the Subcontract Agreement must be by
an officer of your company.
As per Master Subcontract Terms, Article 2, please submit your Schedule of Values as approved by the Project Manager on this project
within 15 days so that your AIA submission will be expedited.
Your AIA Progress Payment Applications must be submitted no later than the twentieth (20) day of each mcnth for work performed up to and
including the last day of the month, (Refer to Master Subcontract Terms, Article 2.2,3).
Only Change Orders, which have been approved by Holt Construction, may be billed against. (Refer to Master Subcontract Terms, Article
3.1). If Change Orders are incorrectly billed against, your Application for Payment will be sent back and an adjusted Application for Payment will
be required.
Unless and until our office is provided with the approved schedule of values, original executed subcontract agreement, current insurance
certificate, current and previous month's executed Waiver of Lien forms, Approved Change Orders (if applicable) and approved Payment
Application, your payment may be delayed.
We sincerely look forward to working with your firm on this project and we expect the conclusion of this agreement will provide for a
successful relationship in the future.
Very truly yours,
HOLT CONSTRUCTION, CORP
Subcontract Information
Contractor: Holt Construction Corp. Project: 18-179. American Express - Centurion Lounge
Subcontractor: N.C. & Sons, Inc, The Nicholson Corporation Contract Date: 04/29/2019
201 Chambersbrook Road Amount:
Branchburg, NJ 08876 Subcontract #: 18-179.020
Telephone: 908-575-0055 Work Description: Millwork
Fax; 908-575-0085 Phase: 06-22-00. .002 Millwork
Holt
FILED: NEW YORK COUNTY CLERK 05/07/2024 02:18 PM INDEX NO. 652351/2024
NYSCEF DOC. NO. 3 RECEIVED NYSCEF: 05/07/2024
Holt Construction Corp.
SUBCONTRACT AGREEMENT
ARTICLE 1
CONSTRUCTION AGREEMENT
This Agreement ("Agreement") made Monday, April 29, 2019 (4129/19) by and between Holt Construction Corp., 50 E
Washington Avenue Pearl River, NY 10965 hereinafter called the "Contractor' and N.C. & Sons, The Nicholson
Corporation, 201 Chambersbrook Road, Branchburg, NJ 08876, hereinafter called the "Subcontractor," to perform part
of the Work on the following Project:
PROJECT: American Express - Centurion Lounge
OWNER: American Express
Notice to the Parties shall be given at the above address by FAX and regular mail (overnight mail if FAX is not available).
ARTICLE 2
CONTRACT PRICE
2.1 The Contractor agrees to pay to the Subcontractor for the satisfactory performance of the Subcontractor's Work,
as defined below, the sum of (the "Subcontractor's Price") in accordance with the terms and
conditions set forth herein.
ARTICLE 3
SCOPE OF WORK
3.1 Subcontractor's Work. The Contractor engages the Subcontractor as an Independent Contractor, to perform the
entire scope of work applicable to its trade and as described in Exhibit A-1 and Exhibit A-2, attached hereto
and incorporated by this reference (the "Subcontractor's Work"). The Subcontractor shall perform
Subcontractor's Work under the general direction of the Contractor and in accordance with this Agreement
and the Contract documents. The Subcontractor shall perform Subcontractor's Work in accordance with the
highest industry standards except where modified by the Contract Documents.
3.2 Contract Documents. The Contract Documents that are binding on the Subcontractor are this Agreement, the Holt
Construction Master Subcontract Terms, the contract between the Owner and the Contractor, including any
modifications (where that document is more restrictive or impose oblig atices not set forth herein), the
documents set forth in Exhibit A-2 of this Agreement and all exhibits attached hereto, each of which is
incorporated by this reference as if fully set forth herein (collect, iely, the 'Contract Documents").
Subcontractor acknowledges and agrees that it has access to, has exam ined, is familiar with, understands,
and has obtained all clarification it deems necessary and appropriate respecting all of Contract Documents
described herein.
3.3 The Work. Subcontractor agrees to furnish and pay for all labor, materials, equipment, services and every other
thing necessary for completion of Subcontractor's Work in accordance vv.th the Contract Documents, or if
they are necessary to produce the intended results and to assure a complete and functional Project.
Subcontractor's Work shall include all obligations of the Subcontractor to comply with the provisions of this
Subcontract and with the provisions of all other Contract Documents. It is further understood that incidental
or minor modifications may be required due to actual job conditions, fielC coordination with other trades or
substitution of equal products due to availability, etc. in that event no request for extras or change orders will
be granted for such modifications required or advisable under the normal scope of work unless a major
change occurs and it is recognized as such by the Architect and Owner Subcontractor represents that it
has carefully examined the Contract Documents and the site and based on such has satisfied itself that
Subcontractor's Work can be performed and completed in accordance with this Agreement. Subcontractor
acknowledges and agrees that this Agreement is effective when signed by Subcontractor and, provided the
Agreement is signed by Subcontractor, applies retroactively to work pe (-formed and services provided by
Subcontractor in furtherance of Subcontractor's Work prior to such effective date of th is Agreement.
ARTICLE 4
PERFORMANCE BOND and LABOR and MATERIAL PAYMENT BOND
4.1 The Subcontractor shall / shall not (strike the one that does NOT apply)
3.2015 18-179.020
FILED: NEW YORK COUNTY CLERK 05/07/2024 02:18 PM INDEX NO. 652351/2024
NYSCEF DOC. NO. 3 RECEIVED NYSCEF: 05/07/2024
Furnish to the Contractor, as named Obligee with others as Obligees at Contractors option, surety bonds to
secure the faithful performance of the Subcontractor's Work and to satisfy all Subcontractor payment obligations
related to Subcontractor's Work. If bonds are required they shall be furnished by a surety acceptable to the
Contractor, in the full amount of the Subcontract Price, and on forms acceptable to Contractor.
ARTICLE 5
CHANGE IN VALUE OF WORK/
CLAIM FOR ADDITIONAL COMPENSATION
5.1 Unless otherwise set forth in Contractor's agreement with the Owner, in the event of a claim for additional
compensation by the Subcontractor, it is agreed that additional materials and labor shall be submitted at the
Subcontractor's cost, which shall include a ten percent (10%) mark-up for overhead and profit on labor, a
five percent (5%) markup for overhead and profit on material and a five percent (5%) mark-up on any sub tier
contractor, a zero percent (0%) mark-up for overhead and profit on other, a zero percent (0%) markup for
rented equipment, and a zero percent (0%) markup for owned equipment.
ARTICLE 6
SCHEDULE OF EXHIBITS
6.1 The following exhibits are incorporated by this reference as Contract Documents:
Exhibits, Exhibits
Exhibit A-1 Contract Authority arid Scope of Work Exhibit D Lien Releases
Exhibit A-2 List of Drawings Exhibit E Insurance Requirements
Exhibit B-1 Milestones and Schedule of Work Exhibit F Clarifications, Exclusions, and Amendments
Exhibit B-2 Absolute Schedule of Work Exhibit G Project Labor Agreements
Exhibit B-3 Schedule of Man-Hours Exhibit H List of Sub-subcontractors and supplies
Exhibit C-1 Schedule of Values Exhibit I Payment Application Form
Exhibit C-2 Unit Pricing Exhibit J Change Order Request Form
Exhibit C-3 Allowances Exhibit K Change Order
Exhibit C-4 Alternates
ARTICLE 7
FORM OF AGREEMENT
7.1 This Agreement shall be binding upon and inure to the benefit of Seller and Purchaser, and their respective
successors, assigns and related entities (subject to any restrictions set forth in the Contract Documents,
if any), and may be executed in multiple counterparts or by facsimile transmission or electronic mail, each
of which shall be treated as an original of this Agreement for all purposes, and all of which together shall
constitute one (1) agreement binding upon all of the parties hereto, notwithstanding that all of the parties
are not signatory to the original or the same counterpart or facsimile transmission.
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement the day and year first above written.
HOLT CONSTRUCTION CORP y?‘,/ N.C. & Sons, The Nicholson Corporation
BY: BY Ohr11001Akt tdr\VIV
Robert Bryan
Christine Shishkoff (Corp.
TITLE: Vice President Seal Here)
PRINT OFFICER'S NAME
Chief Financial Officer
TITLE
N.C. & Sons, The Nicholson Corporation Federal Tax IC4t 22-3485089
N.C. & Sons, The Nicholson Corporation's authorized
representative on site is: .
Emily Fernandez
PRINT NAME
3.2015 18-179.020
FILED: NEW YORK COUNTY CLERK 05/07/2024 02:18 PM INDEX NO. 652351/2024
NYSCEF DOC. NO. 3 RECEIVED NYSCEF: 05/07/2024
EXHIBIT A-1
CONTRACT AUTHORITY AND SCOPE OF WORK
Identification of Subcontractor
Name of Subcontractor: N.C. & Sons, The Nicholson Corporation
Address: 201 Chambersbrook Road
Branchburg, NJ 08876
Telephone: 908-575-0055
Fax: 908-575-0085
Persons authorized on behalf of Subcontractor to make binding commitments:
Name Brandon Nicholson Title President
Christine Shishkoff Chief Financial Officer
Name Title
Identification of General Contractor
HOLT CONSTRUCTION CORP
50 East Washington Ave.
Pearl River, NY 10965
Tel. 845-735-4054
Fax 845-735-4570
The persons authorized on behalf of the General Contractor to make binding commitments are:
John F. Holt Christopher Asaro Phillip Stiller Robert Bryan
The Project Manager is: Emily Cosme
The limit of the Proiect Manager's authority shall be to bind Holt Construction Corp. in matters
having a value of less than $10,000. Regarding matters with a value in excess of $10,000, the
signature of one of the other five persons identified above is necessary to bind Holt
Construction Corp.
Subcontractor agrees to furnish and pay for all labor, materials, equipment, services and every
other thing necessary for completion of all (Millwork) work in accordance with the Contract
Documents, or if they are necessary to produce the intended results and to assure a complete
and functional Project. it is further understood that incidental or minor modifications may be
required due to actual job conditions, field coordination with other trades or substitution of
equal products due to availability, etc. In that event no request for extras or change orders will
be granted for such modifications that are hereby inferred under the normal scope of work
unless a major change occurs and it is recognized as such by the Architect and Owner. In
addition, the Subcontractor shall be responsible for examination of actual conditions at the site.
The Subcontractor affirms that from its own investigations, it has satisfied itself as to the nature
of the work, the character of the equipment and other facilities needed for the performance of
the work, the general and local conditions at the site and all other matters, which may in any
way affect the work or its performance and, further, that the conditions at the site are such that
the work to be performed under this Agreement can be carried on and completed in
accordance with the contract documents. It is the intention of the contract documents to
includes provision for all labor, material and applicable sales & use tax and related services to
fully complete and protect the work of the Subcontractor's trade all as set forth in the Contract
Documents, no matter where it appears. The Scope of Work as described and included in the
Contract Documents and more particularly set forth below. Any limitations or exclusions
contained in the bidding documents shall not be effective to limit or alter the Scope of Work,
unless specifically set forth below.
3.2015 18-179.020
FILED: NEW YORK COUNTY CLERK 05/07/2024 02:18 PM INDEX NO. 652351/2024
NYSCEF DOC. NO. 3 RECEIVED NYSCEF: 05/07/2024
Holt
EXHIBIT A-2
18-179. DRAWING LOG
CONSTRUCTION Pagel of 18
g 07.7.msreb
I Pr9ject: :1P-1?9-Am9rirean ress en :Wen oulige 'ehovigeiriiiioris: Y
Drawing Issued Type Revisions
Date
Revision Rev Date
3301 06/08/18 Specifications N
3302 06/08/18 Specifications N
3303 06/08/18 Specifications
3304 06/08/18 Specifications N
02050 06/08/18 Specifications N
Demolition and Disposal
02073 06/08/18 Specifications N
Cutting Patching and Removal
02110 06/08/18 Specifications N
Demolition Work
02221 06/08118 Specifications N
Excavation Backfilling and Filling
02231 06/08/18 Specifications N
Aggregate Bese Course
02232 06/08/18 Specifications N
Recycled Concrete Aggregate Base Course
02510 06/08/18 Specifications N
Concrete Paving
02551 06/08/18 Specifications N
Asphalt Concrete Paving
02720 06/08/18 Specifications N
Manholes and Drainage Structures
02721 06/08/18 Specifications N
Storm Drainage System
02722 06/08/18 Specifications N
Reinforced Concrete Pipe
02765 06/08/18 Specifications N
Cleaning Storm Drainage and Sanitary System
02832 06/08/18 Specifications N
Metallic - Coated Steel Chain Link Fence and Gates
02844 06/08/18 Specifications N
Temporary Concrete Barriers
03200 06/08/18 Specifications N
Concrete Reinforcement
03300 06/08/18 Specifications N
Cast-In-Place Concrete
23 0719 06/08/18 Specifications N
HVAC Pipe Insulation
01 10 00 06/08/18 Specifications N
Summary of the Work
3.2015 18-179.020
FILED: NEW YORK COUNTY CLERK 05/07/2024 02:18 PM INDEX NO. 652351/2024
Holt
NYSCEF DOC. NO. 3 RECEIVED NYSCEF: 05/07/2024
EXHIBIT A-2
18-179. DRAWING LOG
CONSTRUCTION Page 2 of 18
Pmject: 18-179. American Express - rion:Lounge Show Offild*,.Yi
Drawing Issued Type Revisions
Date
Revision Rev Date
01 14 13 06/08/18 Specifications
Airport Personnel I dentificat ion/ Access Control and Security
01 25 00 06/08/18 Specifications
Substitution Procedures
01 26 00 06/08/18 Specifications
Contract Modification Procedures
01 29 00 06/08/18 Specifications
Payment Procedures
01 31 00 06108/18 Specifications
Project Management and Coordination
01 32 00 06/08/18 Specifications
Construction Progress Documentation
01 32 33 06/08/18 Specifications
Photographic Documentation
01 33 00 06/08/18 Specifications
Submittal Procedures
01 40 00 06/08/18 Specifications
Quality Requirements
01 42 00 06/08/18 Specifications
References
01 50 00 06/08/18 Specifications
Temporary Facilities and Controls
01 60 00 06/08/18 Specifications
Product Requirements
01 73 00 06/08/18 Specifications
Execution
01 77 00 06/08/18 Specifications
Closeout Procedures
01 78 23 06/08/18 Specifications
Operation and Maintenance Data
01 78 39 06/08/18 Specifications
Project Record Documents
01 79 00 06/08/18 Specifications
Demonstration and Training
03 30 00 06/08/18 Specifications
Cast - In- Place Concrete
03 30 53 06/08/18 Specifications
Miscellaneous Cast - In- Place Concrete
04 22 00 06/08/18 Specifications
Concrete Unit Masonry
05 12 00 06/08/18 Specifications
Structural Steel Framing
3.2015 18-179.020
In101r
FILED: NEW YORK COUNTY CLERK 05/07/2024 02:18 PM INDEX NO. 652351/2024
NYSCEF DOC. NO. 3 RECEIVED NYSCEF: 05/07/2024
EXHIBIT A-2
18-179. DRAWING LOG
CONSTRUCTION Page 3 of 18
9.1,2
179meaupreøs genie! bhoyeiheyisiOns: -Y
Drawing Issued Type Revisions
Date
Revision Rev Date
05 31 00 06/08/18 Specifications N
Steel Decking
05 40 00 06/08/18 Specifications N
Cold- Formed Metal Framing
05 51 13 06/08/18 Specifications N
Metal Pan Stairs
06 1353 06/08/18 Specifications N
Miscellaneous Rough Carpentry
06 16 00 06/08/18 Specifications N
Sheathing
06 20 23 06/08/18 Specifications N
Interior Finish Carpentry
06 41 13 06/08/18 Specifications N
Wood- Veneer- Faced Architectural Cabinets
06 64 00 06/08/18 Specifications
Plastic Paneling
07 00 01 06/08/18 Specifications N
Rain screen System
07 19 00 06/08/18 Specifications N
Water Repellents
07 21 00 06/08/18 Specifications N
Thermal Insulation
07 27 01 06/08/18 Specifications N
Air and Vapor Barriers
07 42 13 06/08/18 Specifications N
Metal Plate Wall Panels
07 54 23 06/08/18 Specifications N
Thermoplastic Polyolefin ( TPO) Roofing
07 71 29 06/08/18 Specifications
Manufactured Roof Expansion Joints
07 84 13 06/08/18 Specifications N
Penetration Firestopping
07 84 46 06/08/18 Specifications N
Fire- Resistive Joint Systems
07 92 00 06/08/18 Specifications N
Joint Sealants
07 95 13 06/08/18 Specifications
Expansion Joint Cover Assemblies
08 11 13 06/08118 Specifications N
Hollow Metal Doors and Frames
08 11 19 06/08/18 Specifications N
Stainless- Steel Doors and Frames
3.2015 18-179.020
FILED: NEW YORK COUNTY CLERK 05/07/2024 02:18 PM INDEX NO. 652351/2024
NYSCEF DOC. NO. 3 RECEIVED NYSCEF: 05/07/2024
EXHIBIT A-2
18-179. DRAWING LOG
CONSTRUCTiON Page 4 of 18
Jet. m r can. n Show Revisions: Y
Drawing Issued Type Revisions
Date
Revision Rev Date
08 14 33 06/08/18 Specifications N
Stile and Rail Wood Doors
08 31 13 06108118 Specifications N
Access Doors and Frames
08 33 13 06/08/18 Specifications N
Coiling Counter Doors
08 44 13 06/08/18 Specifications N
Glazed Aluminum Curtain Walls
08 71 00 06/08/18 Specifications N
Door Hardware
08 80 OD 06/08/18 Specifications N
Glazing
08 81 13 06/08/18 Specifications N
Decorative Glass Glazing
08 91 19 06/08/18 Specifications N
Fixed Louvers
09 22 16 06/08/18 Specifications N
Non- Structural Metal Framing
09 29 00 06/08/18 Specifications N
Gypsum Board
09 30 13 06/08/18 Specifications N
Ceramic Tiling
09 51 13 06/08/18 Specifications N
Acoustical Panel Ceilings
09 64 00 06/08/18 Specifications N
Wood Flooring
09 65 13 06/08/18 Specifications N
Resilient Base and Accessories
09 66 23 06/08/18 Specifications N
Resinous Matrix Terrazzo Flooring
09 68 13 06/08/18 Specifications N
Tile Carpeting
09 68 16 06/08/18 Specifications N
Sheet Carpeting
09 72 00 06/08/18 Specifications N
Wall Coverings
09 91 23 06/08/18 Specifications N
Interior Painting
09 96 00 06/08/18 Specifications N
High- Performance Coatings
10 28 00 06/08/18 Specifications N
Toilet Accessories
3.2015 18-179.020
FILED: NEW YORK COUNTY CLERK 05/07/2024 02:18 PM INDEX NO. 652351/2024
Holt
NYSCEF DOC. NO. 3 RECEIVED NYSCEF: 05/07/2024
EXHIBIT A-2
18-17 9. DRAWING LOG
CONSTRUCTION Page 5 of 18
• Project 18179 AmerIcan Express e. PLIAMOYIT,On!LY::
Drawing Issued Type Revisions
Date
Revision Rev Date
10 44 13 06/08/18 Specifications
Fire Extinguishers Cabinets
10 44 16 06/08/18 Specifications
Fire Extinguishers
11 40 00 06/08/18 Specifications
Food Service Sepcifications
11 45 00 06/08/18 Specifications
Food Service Cut Sheets
12 36 40 06/08/18 Specifications
Stone Countertops
12 36 61 06/08/18 Specifications
Simulated Stone Countertops
12 48 53 06/08/18 Specifications
Custom Rugs
14 10 00 06/08/18 Specifications
Dumbwaiters
14 24 00 06/08/18 Specifications
Hydraulic Elevators
21 05 00 06/08/18 Specifications
Common Work Results For Fire Suppression
21 05 48 06/08/18 Specifications
Vibration and Seismic Controls Fire Protection
21 10 00 06/08/18 Specifications
Water- Based Fire- Suppression Systems
21 13 16 06/08/18 Specifications
Dry Pipe Sprinkler System
22 05 00 06/08/18 Specifications
Common Work Results for Plumbing
22 05 19 06/08/18 Specifications
Meters and Gauges for Plumbing Piping
22 05 23 06/08/18 Specifications
General- Duty Valves for Plumbing Piping
22 05 29 06/08/18 Specifications
Plumbing Specialties
22 05 33 06/08/18 Specifications
Heat Tracing for Plumbing Piping
22 05 48 06/08/18 Specifications
Vibration and Seismic Controls f or Plumbing Piping and Equipment
22 05 53 06/08/18 Specifications
Identification for Plumbing piping and Equipment
22 07 00 06/08/18 Specifications
Plumbing Insulation
3.2015 18-179.020
FILED: NEW YORK COUNTY CLERK 05/07/2024 02:18 PM INDEX NO. 652351/2024
Holt
NYSCEF DOC. NO. 3 RECEIVED NYSCEF: 05/07/2024
EXHIBIT A-2
18-179. DRAWING LOG
CONSTRUCTION -.-Page 6 of 18
1 -17.9.;-American Express - Centurion LeOrfge
Drawing Issued Type Revisions
Date
Revision Rev Date
22 11 16 06/08/18 Specifications
Domestic Water Piping
22 11 19 06/08/18 Specifications
Domestic Water Piping Specialties
22 13 16 06/08/18 Specifications
Sanitary Waste and Vent Piping
22 13 19 06/08/18 Specifications
Sanitary Waste Piping Specialties
22 14 13 06/08/18 Specifications
Facility Storm Drainage Piping
22 14 23 06/08/18 Specifications
Storm Drainage Piping Specialties
22 14 29 06/08/18 Specifications
Sump Pumps
22 33 00 06/08/18 Specifications
Electric Domestic Water Heaters
22 34 00 06/08/18 Specifications
Gas Fired Water Heater
22 40 00 06/08/18 Specifications
Plumbing Fixtures
23 05 00 06/08/18 Specifications
Common Work Results for HVAC
23 05 01 06/08/18 Specifications
Basic Piping Materials and Methods
23 05 13 06/08/18 Specifications
Common Motor Requirements for HVAC Equipment
23 05 16 06/08/18 Specifications
Expansion Fittings and Loops for HVAC Piping
23 05 19 06/08/18 Specifications
Meters and Gages for HVAC Piping
23 05 23 06/08/18 Specifications
General- Duty Valves for HVAC Piping
23 05 29 06/08118 Specifications
Hangers and Supports for HVAC Piping and Equipment
23 05 33 06/08/18 Specifications
Heat Tracing For HVAC Piping
23 05 48 06/08/18 Specifications
Vibration and Seismic Controls for HVAC Equipment
23 05 53 06/08/18 Specifications
Identification for HVAC Piping and Equipment
23 05 93 06/08/18 Specifications
Testing Adjusting and Balancing
3.2015 18-179.020